2019B schedule and programs

List of 2019B QSO programs for MegaCam, WIRCam, ESPaDOnS, SITELLE, and SPIRou.

QrunID Instrument HST Dates # Nights Status Run Summary
19BQ01 MegaCam Aug 1 - Sep 9 40 Done
19BQ02 SPIRou Sep 10 1 Done Engineering night.
19BQ03 SITELLE Sep 11 1 Done Engineering night
19BQ04 ESPaDOnS Sep 12 - 16 5 Done This short was very poor, and was affected by fog, high humidity, and clouds. Only a handful of hours produced useful observations.
19BQ05 SPIRou Sep 17 - 25 9 Done
19BQ06 SITELLE Sep 26 - 30 5 Done
19BQ07 SPIRou Oct 1 - 15 15 Done
19BQ08 WIRCam Oct 16 - 21 6 Done
19BQ09 MegaCam Oct 22 - 28 7 Done
19BQ10 SPIRou Oct 29 - Nov 13 16 Done The run was extended by 1 night.
19BQ11 ESPaDOnS Nov 14 - 21 8 Done
19BQ12 WIRCam Nov 22 - 26 5 Done
19BQ13 MegaCam Nov 27 - Dec 3 7 Done
19BQ14 SPIRou Dec 4 - 18 15 Done Due to the failure of the telescope hydraulics, SPIRou was not available for science during the last 6 nights of the run.
19BQ15 SITELLE Dec 19 - 25 7 Lost Due telescope hydraulics issues, the exchange to SITELLE was postponed, and the run was lost to this technical issue.
19BQ16 MegaCam Dec 26 - Jan 2 8 Lost The run was lost due to the ongoing failure of the telescope hydraulics.
19BQ17 SPIRou Jan 3 - 22 20 Cancelled SPIRou warmed up in late December and will not get operation again until the end of January.
19BQ18 WIRCam Jan 23 - 27 5 Cancelled
19BQ17 SPIRou Jan 23 - 27 5 Done SPIRou was kept on the telescope and is operational.
19BQ19 MegaCam Jan 28 - 31 4 Done This run will continue into 2020A.