List of 2019B QSO programs for MegaCam, WIRCam, ESPaDOnS, SITELLE, and SPIRou.
QrunID | Instrument | HST Dates | # Nights | Status | Run Summary |
---|---|---|---|---|---|
19BQ01 | MegaCam | Aug 1 - Sep 9 | 40 | Done | |
19BQ02 | SPIRou | Sep 10 | 1 | Done | Engineering night. |
19BQ03 | SITELLE | Sep 11 | 1 | Done | Engineering night |
19BQ04 | ESPaDOnS | Sep 12 - 16 | 5 | Done | This short was very poor, and was affected by fog, high humidity, and clouds. Only a handful of hours produced useful observations. |
19BQ05 | SPIRou | Sep 17 - 25 | 9 | Done | |
19BQ06 | SITELLE | Sep 26 - 30 | 5 | Done | |
19BQ07 | SPIRou | Oct 1 - 15 | 15 | Done | |
19BQ08 | WIRCam | Oct 16 - 21 | 6 | Done | |
19BQ09 | MegaCam | Oct 22 - 28 | 7 | Done | |
19BQ10 | SPIRou | Oct 29 - Nov 13 | 16 | Done | The run was extended by 1 night. |
19BQ11 | ESPaDOnS | Nov 14 - 21 | 8 | Done | |
19BQ12 | WIRCam | Nov 22 - 26 | 5 | Done | |
19BQ13 | MegaCam | Nov 27 - Dec 3 | 7 | Done | |
19BQ14 | SPIRou | Dec 4 - 18 | 15 | Done | Due to the failure of the telescope hydraulics, SPIRou was not available for science during the last 6 nights of the run. |
19BQ15 | SITELLE | Dec 19 - 25 | 7 | Lost | Due telescope hydraulics issues, the exchange to SITELLE was postponed, and the run was lost to this technical issue. |
19BQ16 | MegaCam | Dec 26 - Jan 2 | 8 | Lost | The run was lost due to the ongoing failure of the telescope hydraulics. |
19BQ17 | SPIRou | Jan 3 - 22 | 20 | Cancelled | SPIRou warmed up in late December and will not get operation again until the end of January. |
19BQ18 | WIRCam | Jan 23 - 27 | 5 | Cancelled | |
19BQ17 | SPIRou | Jan 23 - 27 | 5 | Done | SPIRou was kept on the telescope and is operational. |
19BQ19 | MegaCam | Jan 28 - 31 | 4 | Done | This run will continue into 2020A. |